Skip to content
Human Resource Management Diploma​
  • Home
  • Courses
    • Diploma & Advanced Diploma
    • Certificate Courses
    • WSQ Courses
    • SFARC Courses
  • Student Corner
    • Events
      • Graduation Ceremony
      • Mr & Ms Edusphere
    • Career support
      • Seminars – Hotel Management Career
      • Seminars – Healthcare Career
  • Policies
    • Privacy Policy
    • Terms and Conditions
    • Support for Students
  • Careers
    • Adult Trainers | Careers at Edusphere College
  • About Us
    • Campus and Facilities
    • Our Managers
    • Our Academic and Examination Board
    • Our Teachers
    • Organization Chart
    • Contact Us
  • Home
  • Courses
    • Diploma & Advanced Diploma
    • Certificate Courses
    • WSQ Courses
    • SFARC Courses
  • Student Corner
    • Events
      • Graduation Ceremony
      • Mr & Ms Edusphere
    • Career support
      • Seminars – Hotel Management Career
      • Seminars – Healthcare Career
  • Policies
    • Privacy Policy
    • Terms and Conditions
    • Support for Students
  • Careers
    • Adult Trainers | Careers at Edusphere College
  • About Us
    • Campus and Facilities
    • Our Managers
    • Our Academic and Examination Board
    • Our Teachers
    • Organization Chart
    • Contact Us
Blog

Technical Officer Interview Guide: Questions & Answers 2026

  • 21 Nov, 2025
  • Com 0
Technical Officer Interview Guide

 A. Technical Knowledge Questions

 

 1. Explain the sequence of structural works from substructure to superstructure.

 

Answer:

The typical sequence is:

– Site Preparation: Clearing, hoarding, site office setup

– Earthworks: Excavation to formation level

– Piling Works: Bored piles, driven piles, or sheet piling

– Pile Cap & Ground Beams: Foundation elements

– Basement Construction: Retaining walls, basement slabs (if applicable)

– Ground Floor Slab: On grade or suspended slab

– Columns & Walls: Vertical structural elements

– Beams & Slabs: Floor-by-floor construction

– Roof Structure: Final superstructure element

– Architectural & M&E Works: Follow structural completion

 

 2. How do you interpret structural drawings such as rebar detailing, grids, and sections?

 

Answer:

– Grid Lines: Identify column positions using alphanumeric references (A-1, B-2)

– Sections: Understand cut-through views showing vertical relationships

– Rebar Detailing: Read bar marks, spacing (c/c), diameter (T10, T16), length, and lap requirements

– Schedules: Cross-reference bar bending schedules with drawings

– Symbols: Understand standard notations for hooks, stirrups, cover requirements

– Dimensions: Check from grid to grid, not cumulative measurements

 

 3. What steps do you follow when raising an RFI on site?

 

Answer:

  1. Identify the issue or unclear information in drawings/specs
  2. Document with photos, sketches, or marked-up drawings
  3. Log RFI in project system with unique reference number
  4. Clearly state the question and proposed solution (if any)
  5. Submit to consultant/architect via proper channel
  6. Follow up regularly until response received
  7. Distribute response to relevant parties
  8. Update site team and ensure implementation
  9. File documentation for record

 

 4. How do you check and verify rebar installation before calling for inspection?

 

Answer:

– Verify bar mark, diameter, and spacing against drawings

– Check cover using spacers/chairs (typically 25-50mm)

– Ensure proper lap lengths (40-60 times bar diameter)

– Verify starter bars from previous pour

– Check hook details and anchorage

– Ensure cleanliness (no rust flakes, oil, dirt)

– Confirm tie-wire adequacy

– Take pre-inspection photos

– Complete internal QC checklist

– Coordinate with foreman before calling RE/RTO

 5. Explain the importance of method statements and risk assessments before starting work.

 

Answer:

Method Statements:

– Define step-by-step work sequence

– Identify resources, equipment, and manpower

– Ensure everyone follows the same procedure

– Meet BCA and contractual requirements

– Serve as reference during execution

 

Risk Assessments:

– Identify potential hazards (falls, lifting, electrical)

– Evaluate severity and likelihood

– Implement control measures

– Protect workers and public

– Legal requirement under WSH Act

– Reduce accidents and project delays

 

 6. Describe your experience with BCA inspections (structural, architectural, M&E).

 

Answer:

– Structural: Attended inspections for foundation, columns, beams, slabs—ensured compliance with approved drawings and CP65

– Architectural: Coordinated inspections for facade, windows, waterproofing—checked against CONQUAS standards

– M&E: Supported inspections for fire protection, plumbing, electrical installations—verified against codes (CP5, SS564)

– Prepared inspection request forms, ensured sites were ready

– Addressed non-conformance items promptly

– Maintained inspection records for compliance

 

 7. What is the difference between shop drawings, IFC drawings, and as-built drawings?

 

Answer:

– Shop Drawings: Prepared by subcontractors/suppliers showing fabrication details; require consultant approval before manufacturing

– IFC Drawings (Issued for Construction): Approved construction drawings used on site; basis for actual work

– As-Built Drawings: Updated drawings reflecting actual site conditions, including all variations and changes; submitted at project completion

 

 8. How do you ensure subcontractors follow specifications on site?

 

Answer:

– Conduct pre-work briefings explaining requirements

– Issue approved specifications and drawings

– Perform regular inspections during work

– Use checklists to verify compliance

– Photographic documentation of non-compliance

– Issue non-conformance reports (NCR) when needed

– Hold progress meetings to address issues

– Build good relationships for better cooperation

– Escalate persistent issues to management

 

 9. Explain what CONQUAS is and how it affects quality.

 

Answer:

CONQUAS (Construction Quality Assessment System) is BCA’s scoring system measuring workmanship quality in three areas:

– Structural Works: 50% (accuracy, finishes)

– Architectural Works: 35% (tiling, plastering, painting)

– M&E Works: 15% (installation quality)

 

Impact:

– Higher scores enhance company reputation

– Affects BCA grading and future tender eligibility

– Requires strict adherence to tolerances

– Demands proper supervision and QC

– Typical target: 80+ points

 10. What types of tests are required for concrete?

 

Answer:

– Slump Test: Measures workability/consistency (typically 75-125mm)

– Cube Test: 3, 7, 28-day compression strength testing

– Temperature Test: Ensures concrete within limits (typically <32°C)

– Density Test: Verification of concrete density

– Chloride Content: For durability compliance

– Ultrasonic Testing: For integrity assessment (when required)

– All tests documented with proper labels and test certificates

 

 11. Describe your experience with M&E coordination.

 

Answer:

– Reviewed clash detection between structure and M&E services

– Coordinated openings, sleeves, and blockouts before concrete pour

– Ensured proper builder’s work items installed

– Attended M&E coordination meetings

– Verified adequate ceiling height after services installation

– Coordinated with M&E contractors for testing schedules

– Ensured access provisions for maintenance

 

 12. Explain the typical T&C (Testing & Commissioning) workflow for MEP systems.

 

Answer:

  1. Pre-commissioning: Visual inspections, cleaning, flushing
  2. Individual Testing: Component-level testing (pumps, fans, panels)
  3. Integrated Testing: System-level operation
  4. Performance Testing: Verify design parameters
  5. Documentation: Test certificates, manuals, O&M documents
  6. Training: For facility management team
  7. Authority Inspections: BCA/SCDF/NEA as required
  8. Handover: With complete documentation

 

—

 

 B. Practical Site-Based Questions

 

 1. What do you do if you discover work is progressing without approved drawings?

 

Answer:

– Immediately stop the work

– Inform site supervisor and project manager

– Document the situation with photos

– Identify what has been completed

– Check if work aligns with latest drawings (even if not formally approved)

– Expedite drawing approval process

– Issue non-conformance report if necessary

– Obtain RTO/consultant direction on rectification or acceptance

– Resume only after proper approval

 

 2. How do you handle a site safety violation you observe?

 

Answer:

– Stop work immediately if imminent danger

– Approach worker calmly and explain the violation

– Ensure safe condition before work resumes

– Report to safety officer and site supervisor

– Document incident with photos

– Issue safety advisory or warning letter

– Conduct toolbox talk on the specific issue

– Follow up to ensure corrective action

– Report to management if repeated violations

 

 3. What actions will you take when progress is behind schedule?

 

Answer:

– Analyze root causes (manpower, weather, material delay)

– Meet with subcontractors to discuss recovery plan

– Propose additional resources or overtime

– Prioritize critical path activities

– Implement parallel working where possible

– Update site program with recovery measures

– Daily monitoring of progress

– Escalate to project manager with clear action plan

– Regular updates to stakeholders

 

 4. Describe a time when you had to manage conflict between subcontractors.

 

Answer:

“Two subcontractors disputed workspace allocation. I:

– Listened to both parties separately

– Reviewed site logistics plan and program

– Called joint meeting to discuss solution

– Proposed staggered work schedule

– Clearly defined work zones

– Documented agreement in site minutes

– Monitored compliance

– Maintained professional relationship with both parties

– Escalated to management when agreement couldn’t be reached”

 

 5. How do you ensure timely inspection by RTO/RE?

 

Answer:

– Submit inspection requests well in advance (48-72 hours)

– Ensure work is fully ready before calling

– Complete internal QC checks first

– Provide clear access and lighting

– Prepare all required documents (test certificates, material approvals)

– Maintain good communication with RTO office

– Follow up with reminder calls/emails

– Schedule around RTO’s availability

– Have alternative dates ready

 

 6. What is your daily routine when you report to site?

 

Answer:

– Attend morning briefing/safety talk

– Review day’s work plan and priorities

– Check weather conditions

– Walk site to assess overnight progress

– Coordinate with subcontractors on daily activities

– Monitor critical activities in progress

– Conduct inspections and quality checks

– Update site diary and progress records

– Process incoming materials and approvals

– Prepare for upcoming inspections

– Attend coordination meetings

– Update daily reports before leaving

 

—

 

  1. Documentation & QC Questions

 

 1. What site documents do you prepare daily as a Technical Officer?

 

Answer:

– Site diary (weather, manpower, activities, visitors)

– Daily progress reports

– Material delivery records

– Inspection request forms

– Non-conformance reports (NCR)

– Safety observation reports

– Progress photos

– RFI logs (updates)

– Manpower attendance

– Equipment deployment records

– Meeting minutes

– QC checklists

 

 2. Explain the steps in preparing an inspection checklist.

 

Answer:

  1. Review relevant specifications and drawings
  2. Identify critical checkpoints
  3. List acceptance criteria (tolerances, standards)
  4. Organize logically (sequence of work)
  5. Include measurement requirements
  6. Add photo/documentation requirements
  7. Provide spaces for remarks
  8. Include sign-off section
  9. Reference applicable codes (CP65, BS, etc.)
  10. Review and approve before use
  11. Update based on feedback

 

 3. How do you maintain material delivery records and material approval?

 

Answer:

Delivery Records:

– Log all deliveries with DO number, date, quantity

– Verify against purchase order

– Check material condition on arrival

– Take photos of delivered materials

– Store in organized filing system

– Track against material schedule

 

Material Approval:

– Submit samples/catalogues to consultant

– Maintain approval register with status

– Follow up pending approvals

– Ensure only approved materials used

– Keep approved samples on site for reference

– Update as-built records with approved materials

 

 4. What software/Excel trackers have you used to follow up site progress?

 

Answer:

– Microsoft Excel: Progress tracking, material registers, inspection logs, RFI trackers

– Microsoft Project: Program monitoring

– AutoCAD: Drawing review and markups

– Bluebeam/Adobe: PDF annotation and drawing management

– Procore/Aconex: Document management systems

– WhatsApp/Teams: Daily coordination

– Custom dashboards for management reporting

– Photo management software

 

 5. Explain the importance of daily site reports.

 

Answer:

  • Legal Record: Evidence of site conditions and activities
  • Progress Tracking: Document actual vs. planned progress
  • Issue Documentation: Record problems and delays
  • Resource Management: Track manpower and equipment
  • Weather Recording: Document weather-related delays
  • Communication Tool: Keep stakeholders informed
  • Claims Support: Evidence for EOT or variation claims
  • Quality Record: Document inspections and tests
  • Compliance: Meet contractual reporting requirements

 

—

 

 D. Behavioural / Attitude Questions

 

 1. How do you handle pressure when multiple subcontractors need supervision?

 

Answer:

  • Prioritize based on critical path and inspection deadlines
  • Communicate clearly with all parties about schedule
  • Delegate routine checks to assistant or foreman when possible
  • Stay organized with checklists and schedules
  • Remain calm and professional under pressure
  • Address urgent safety issues first
  • Schedule overlap time with subcontractors
  • Request support from team when overwhelmed
  • Learn to manage time effectively through experience

 

 2. What motivates you to work in construction?

 

Answer:

“I’m motivated by:

  • Seeing tangible results of my work (physical structures)
  • Daily variety and challenges
  • Team collaboration and problem-solving
  • Continuous learning (technical knowledge, standards)
  • Being part of nation-building projects
  • Dynamic site environment
  • Career progression opportunities in the industry
  • Satisfaction of delivering quality projects safely”

 

 3. Describe a situation where you corrected a mistake on site.

 

Answer:

“During rebar inspection, I noticed incorrect bar spacing in a beam. I:

  • Immediately stopped concreting preparation
  • Verified against drawings and bar schedule
  • Documented with photos
  • Informed subcontractor and site supervisor
  • Supervised correction before proceeding
  • Conducted re-inspection
  • Updated inspection records
  • Reinforced specification requirements with team
  • Learned to catch such issues earlier in the process”

 

 4. Why do you think communication is important in site work?

 

Answer:

  • Prevents misunderstandings and rework
  • Ensures everyone understands requirements
  • Coordinates multiple trades effectively
  • Resolves issues quickly
  • Maintains safety awareness
  • Builds trust and teamwork
  • Keeps project on schedule
  • Facilitates problem-solving
  • Creates proper documentation trail
  • Bridges language barriers (important in Singapore’s multi-cultural sites)

 

 5. If selected, how soon can you start and what support do you need?

 

Answer:

“I can start with [notice period—typically 2 weeks to 1 month]. To be effective, I would need:

  • Proper project briefing and document handover
  • Introduction to project team and consultants
  • Access to project documentation system
  • Clear reporting structure and authority levels
  • Understanding of company QA/QC procedures
  • Site safety orientation
  • PPE and necessary tools
  • Mentorship during initial period (if junior)

I’m committed to learning quickly and contributing to project success.”

 

—

 

 Additional Questions & Answers (10 More)

 

 E. Advanced Technical Questions

 

 1. How do you calculate concrete volume for a pour and coordinate with RMC supplier?

 

Answer:

  • Measure dimensions from drawings (length × width × height)
  • Add 5-10% wastage factor
  • Coordinate timing with site readiness
  • Confirm concrete grade, slump, and additives
  • Arrange delivery schedule to avoid cold joints
  • Prepare access route for concrete trucks
  • Ensure adequate labor for placement
  • Have backup supplier contact for emergencies

 

 2. What are the key differences between Grade 30 and Grade 40 concrete?

 

Answer:

  • Grade 30: 30 N/mm² characteristic strength at 28 days; used for general construction, slabs, minor structural elements
  • Grade 40: 40 N/mm² characteristic strength; used for main structural elements like columns, beams requiring higher strength
  • Grade 40 has higher cement content and stricter mix proportions
  • Cube testing requirements are more stringent for Grade 40
  • Curing requirements may differ

 

 3. Explain the purpose of construction joints and how they differ from expansion joints.

 

Answer:

Construction Joints:

  • Planned stopping points in concrete placement
  • No movement expected
  • Use shear keys or surface preparation for bonding
  • Located at low-stress areas

 

Expansion Joints:

  • Allow for thermal movement and settlement
  • Filled with compressible material
  • Continuous through entire structure
  • Prevent cracking from expansion/contraction

 

 4. What is the purpose of the 7-day concrete cube test?

 

Answer:

  • Early strength verification (typically achieves 65-70% of 28-day strength)
  • Early warning of potential strength issues
  • Allows corrective action before critical pours
  • Required for early formwork removal decisions
  • Supports early loading if strength adequate
  • Complements 28-day strength assessment

 

 5. How do you prevent honeycombing in concrete?

 

Answer:

  • Ensure proper concrete mix design (adequate workability)
  • Use appropriate slump (not too dry)
  • Proper compaction using poker vibrators
  • Adequate cover to reinforcement (easier flow)
  • Proper formwork joints (prevent leakage)
  • Controlled pour height (max 1.5-2m drops)
  • Avoid over-vibration (segregation)
  • Use tremie pipes for deep pours

 

—

 

 F. Quality Control & Standards

 

 6. What is CP65 and why is it important?

 

Answer:

CP65 (Code of Practice for Structural Use of Concrete) is Singapore’s standard for:

  • Concrete design requirements
  • Material specifications
  • Construction tolerances
  • Workmanship standards
  • Testing requirements
  • Safety factors

 

Importance:

  • Legal compliance requirement
  • Ensures structural safety
  • Provides uniform standards
  • Used by BCA for approval
  • Reference for dispute resolution

 

 7. Explain the difference between QA and QC in construction.

 

Answer:

Quality Assurance (QA):

  • Process-oriented
  • Prevents defects
  • Systematic procedures
  • Plans and standards
  • Example: Method statements, training

 

Quality Control (QC):

  • Product-oriented
  • Detects defects
  • Inspection and testing
  • Verification activities
  • Example: Concrete cube testing, dimensional checks

 

Both work together to ensure project quality.

 

 8. What are common architectural finishes you need to check for CONQUAS scoring?

 

Answer:

  • Tiling: Alignment, level, joint width, hollow tiles
  • Plastering: Surface evenness, verticality, cracks
  • Painting: Coverage, color uniformity, defects
  • Windows/Doors: Operation, sealing, installation tolerance
  • Floor finishes: Level, cracks, surface finish
  • External walls: Alignment, water tightness, finish quality

 

Tolerances typically: ±3mm for tiling, ±5mm for plastering verticality

 

—

 

 G. Safety & Regulatory

 

 9. What are your responsibilities under the Workplace Safety and Health Act?

 

Answer:

As a Technical Officer, I must:

  • Take reasonable care for my own safety and others
  • Cooperate with safety measures
  • Not engage in unsafe behavior
  • Report unsafe conditions immediately
  • Attend safety training and briefings
  • Use provided PPE correctly
  • Follow safe work procedures
  • Stop work if imminent danger observed
  • Support safety culture on site
  • Report incidents/near-misses

 

 10. What are stop-work items you would immediately address on site?

 

Answer:

  • Working at height without proper edge protection
  • Excavation without shoring/barriers
  • Lifting operations without proper rigging
  • Work without approved method statement/RA
  • Electrical work by unqualified personnel
  • Missing PPE for critical tasks
  • Damaged scaffolding or equipment
  • Work during lightning warning
  • Crane operations in unsafe wind conditions
  • Any imminent danger to workers or public

 

—

 

 Evaluation Criteria Summary

 

Technical Competency:

  • Can read and interpret drawings accurately
  • Understands construction sequence and methods
  • Knowledge of materials and testing requirements
  • Familiar with codes and standards (CP65, BCA regulations)

 

Quality Mindset:

  • Strong attention to detail
  • Proactive in identifying issues
  • Systematic approach to QC
  • Understands CONQUAS requirements

 

Communication Skills:

  • Clear and professional communication
  • Able to coordinate multiple parties
  • Good documentation practices
  • Confident in dealing with consultants/authorities

 

Work Attitude:

  • Able to work under pressure
  • Problem-solving capability
  • Team player with leadership potential
  • Safety-conscious mindset
  • Reliable and disciplined

 

Experience & Knowledge:

  • Understanding of BCA processes
  • Practical site experience
  • Familiarity with site documentation
  • Knows inspection procedures

 

 

20+ Hotel Management Interview Questions and Answers -2025
Advanced Diploma vs Higher Diploma in Singapore: Which One Helps You Upskill Faster?

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Human Resource Management Diploma​

Address: 7500A Beach Rd, #05-312 THE PLAZA, Singapore 199591

CPE Reg No: 201940174R

Validity date: From 28 August 2022To 27 August 2026

Our Timing: Mondays – Fridays | 8.30am – 6.00pm 

Connect with us:

Icon-facebook Icon-instagram Tiktok Linkedin Youtube

Quick Links

Home

Diploma Courses

Advanced Diploma Courses

Certificate Courses

WSQ Courses

SFARC Courses

Frequently Asked Questions

Student Feedback Form

Get updates

Edusphere College of Management and Technology
thumsup  Thank you for Signing Up
Please correct the marked field(s) below.
1,true,6,Lead Email,21,false,1,First Name,21,false,1,Last Name,2
  Thank you for Signing Up
close

Contact Information

Reach Out for Diploma Courses:
(+65) 9125 4523
admin@edusphere.edu.sg
Reach Out for WSQ Courses:
(+65) 8221 5143
training@edusphere.edu.sg
Management Contact:
(+65) 8220 0095
info@edusphere.edu.sg
Copyright 2026 Edusphere College of Management and Technology | Developed By ECMT. All Rights Reserved
Retail and E-Commerce Management Diploma​